ProRheno Basel
-
Expansion of the Basel wastewater treatment plant (EA)
-
The ProRheno Basel wastewater treatment plant has been in operation since 1982. It has now reached its capacity limits and can no longer meet the requirements of the Swiss Waters Protection Act. ProRheno has therefore been expanded and upgraded since 2019. The biological treatment stage is being rebuilt to increase treatment performance. A sequencing batch reactor (SBR) process with nine reactors was selected to remove organic load, phosphorus and total nitrogen.
-
Product description
-
For the expansion of the Basel wastewater treatment plant and the nine planned SBR reactors, six Käser HP 9000 turbo compressors with magnetic bearings were installed. The compressors are designed for continuous operation. Their active magnetic bearings also allow intermittent operation. Waste heat from the frequency converters is to be removed by water cooling.
Two redundant cooling stations are planned: one will operate while the other remains on standby.