Model Group Switzerland
Reactive power compensation systems at Model AG in Weinfelden (TG) had been failing increasingly often. Some newly installed systems had defective capacitors after only a few months. Power quality measurements revealed substantial disturbances that strained conventional compensation systems and could not be remedied by them. Together with Atlas Umwelt, the existing locations and their compensation needs were reassessed. A comprehensive improvement plan was developed using active filters and new reactive power compensation systems without conventional capacitors.
-
Installation of active filters and reactive power compensation at Model AG in Weinfelden
-
960 A active filter capacity.
1,725 kVAr reactive power compensation.
-
Sinexcel AHF and SVG filters
-
Measurement, planning, installation and commissioning