ARA Bern
The reconstruction of the biological treatment stage at ARA Region Bern AG introduced new high-performance turbo compressors with frequency converters. In coordination with the energy supplier BKW, the connection applications specified that power quality must meet the D-A-CH-CZ rules. The system was designed using PARMELTEC.
-
Maximum energy efficiency and safe operation guided the design, from the
Transformer configuration
using water cooling for the turbo compressor frequency converters
in combination with EMC-compliant, appropriately sized power cables
delivering power quality through active filters
keeping the system ready for many years of operation.
-
Installation of two active filters
-
Two new FN3420-250-480-3 filters
-
Measurement, planning and installation